The preparation work that needs to be done before the construction of wood floor glue is crucial, which is directly related to the smooth progress of subsequent construction and the quality and durability of the floor.
Before construction, the ground needs to be thoroughly cleaned first. Use brooms, mops and other tools to remove dust, oil, debris, etc. on the ground to ensure that the ground is clean and free of dirt. At the same time, check the ground to ensure that the ground is flat, dry and crack-free. If the ground is found to be uneven, it needs to be leveled. Cement mortar or self-leveling cement can be used for repair to ensure the flatness after the floor is laid.
Before construction, the area of the room needs to be measured in order to accurately calculate the amount of wood floor glue required. At the same time, the laying direction and pattern of wood floor glue should be planned according to the layout and design requirements of the room. This step helps to avoid waste of materials during construction and ensure that the final laying effect meets expectations.
According to the measurement results and planning, prepare enough wood floor glue, base treatment agent, cleaner, cutting tools, rollers, brushes and other materials and tools required for construction. Make sure that all materials meet national standards and construction requirements to avoid construction failures caused by material quality problems.
Before laying wood floor glue, the base needs to be treated. Applying the base treatment agent is an important step, which can enhance the bonding between the base and the wood floor glue and improve the durability of the floor. Apply evenly when brushing to avoid missing or over-thick brushing.
The temperature and humidity of the construction environment have a great impact on the laying effect of wood floor glue. Before construction, it is necessary to check the indoor temperature and humidity to ensure that they meet the construction requirements. Generally speaking, the indoor temperature should not be lower than 18 degrees and the relative humidity should not exceed 70%. If the temperature and humidity do not meet the requirements, measures need to be taken to adjust them, such as turning on the air conditioner or dehumidifier.
Construction personnel are the key to the construction of wood floor glue. Before construction, technical training is required for construction personnel to make them familiar with the construction process and operating specifications. This helps to ensure safety and quality during the construction process and avoid construction errors or safety accidents.
Safety is an important part of the construction process that cannot be ignored. Before construction, safety preparations need to be made, such as wearing safety helmets, gloves and other protective equipment to ensure safety during construction. At the same time, the construction site should be cleaned to ensure that there are no debris, oil stains and other safety hazards. In addition, emergency measures need to be prepared to deal with possible emergencies.
The preparations that need to be made before the construction of wood floor glue include ground cleaning and inspection, measurement and planning, material preparation, base treatment, temperature and humidity inspection, construction personnel training and safety preparation. These preparations are important prerequisites for ensuring the quality of wood floor glue construction, which helps to achieve the flatness, beauty and durability of the floor. During the construction process, it is also necessary to strictly follow the construction specifications to ensure the quality and safety of the construction.